Projects

  • Fitout,
  • Commercial,
  • UK

Bridgepoint, 5 Marble Arch

Built is completing fitout works for client Bridgepoint within a new 7 storey development, 5 Marble Arch.

£500k
  • Fitout,
  • Commercial,
  • UK

Aveva

Built was engaged from RIBA Stage 3 to carry out the technical design and construction of Aveva’s new 10,000sq.ft London Headquarters at Level 5, 30 Cannon St.

£1.2
  • Fitout,
  • Commercial,
  • UK

The Corniche Commercial Office Fitout

Built was engaged by St James Group Limited to undertake the commercial office fitout to 2 floors across Blocks B & C to a Cat A+ level to a new premium development on the Thames, The Corniche.

£1.4m
  • Refurbishment,
  • Commercial,
  • UK

88 Leadenhall St

Built was engaged by BIA to undertake the full building Cat A refurbishment across all nine floors to 88 Leadenhall St, including the fitout of a new reception lobby.

£4.3m
  • Refurbishment,
  • Commercial,
  • UK

The Circle

Built was engaged by Field Day Developments to undertake commercial refurbishment works at The Circle, Bermondsey.

£1.1m
  • Fitout,
  • Refurbishment,
  • Commercial,
  • UK

Woods Bagot Europe

Built was contracted to complete a fitout of an existing first floor studio to create a new feeling to the working space.

<£100k
  • Fitout,
  • Commercial,
  • UK

Worple Road

Built was selected to deliver this project for repeat client, Nuveen.