Projects

  • Construction,
  • Development,
  • Refurbishment,
  • Small Works,
  • Commercial,
  • NSW

Sub Station No. 164

Sitting unused for decades, Sub Station No. 164 is the ambitious revitalisation of two adjacent historic Sydney buildings. Now one of Sydney’s most innovative office developments, Sub Station No. 164, previously relegated to the too hard basket by other developers, sets a benchmark for heritage buildings of the future.

$180m
  • Construction,
  • Commercial,
  • NSW

Parramatta Square

Parramatta Square – one of Australia’s largest urban regeneration projects – has cemented Parramata as Sydney’s second CBD. When complete the new precinct will deliver six buildings, 6,000sqm of public space, a refurbished Town Hall and state of the art library and accommodate an ever-growing workforce of 23,500 people.

$3.2 billion
  • Construction,
  • Fitout,
  • Commercial,
  • SA

GPO Exchange

The 32,000sqm GPO Exchange project brings together two striking environments – a 20-storey PCA A-grade commercial office tower that sits beside the refurbished and restored heritage Telephone Exchange Building, which was last opened in 1957.

$160m
  • Development,
  • Commercial,
  • NSW

Liverpool Civic Place

In conjunction with the delivery of new civic facilities for Liverpool City Council, Built will develop two new mixed-use towers comprising 250 apartments, a 140 room hotel, a 150 room student accommodation facility and circa 1200m2 of retail premises.

$300m
  • Construction,
  • Commercial,
  • NSW

Barrack Place

Barrack Place at 151 Clarence Street, Sydney involved the demolition of an existing 16,000 sqm B-grade building to make way for a new, next generation A-grade, 18 storey, 22,000 sqm building designed to achieve a target 6 Star Green Star and a 5 Star NABERS Energy rating.

Undisclosed
  • Small Works,
  • Commercial,
  • NSW

The Benevolent Society

Built completed the fitout 27 new sites encompassing over 13,500m2 throughout metropolitan and regional NSW within 15 weeks. Following the completion the individual fitout projects the Built engaged to complete The Benevolent Society’s new 2,400m2 national head office in Glebe.

$21m
  • Fitout,
  • Refurbishment,
  • Commercial,
  • UK

Woods Bagot Europe

Built was contracted to complete a fitout of an existing first floor studio to create a new feeling to the working space.

<£100k
  • Fitout,
  • Refurbishment,
  • Commercial,
  • VIC

637 Flinders Street

Peakstone engaged Built to fully refurbish and reposition its Melbourne CBD commercial asset.

Undisclosed
  • Refurbishment,
  • Commercial,
  • UK

The Circle

Built was engaged by Field Day Developments to undertake commercial refurbishment works at The Circle, Bermondsey.

£1.1m
  • Fitout,
  • Refurbishment,
  • Commercial,
  • VIC

Collins Place

As head contractor Built helped to create Collins Place’s vision for “a refreshed lobby experience that emphasises light, openness and community connection by expanding and revitalising the spaces to enrich visitor and user experience.”

Undisclosed
  • Construction,
  • Fitout,
  • Refurbishment,
  • Commercial,
  • VIC

Worksafe, 1 Malop St

Built worked alongside Quintessential Equities on the design and construction of a new 14-storey office tower for WorkSafe Victoria in Geelong.

$93m
  • Fitout,
  • Refurbishment,
  • Commercial,
  • QLD

Transport House

Built was engaged to undertake the complex refurbishment of this inner city building for repeat client LaSalle.

$13m
  • Refurbishment,
  • Commercial,
  • Hospitality & Hotels,
  • Retail,
  • WA

Raine Square

Built was engaged by repeat client Charter Hall to undertake the Raine Square redevelopment at 300 Murray Street in Perth’s CBD. The project has transformed the existing retail and hotel complex into a major retail, dining and entertainment destination.

$56m
  • Fitout,
  • Commercial,
  • NSW

Arup

Built was engaged by Arup to construct their new 5 level commercial fitout comprising 7,800m2. The project is an integrated fitout with the base build Design & Construction also awarded to Built by repeat client Investa.

$18m
  • Fitout,
  • Commercial,
  • UK

Aveva

Built was engaged from RIBA Stage 3 to carry out the technical design and construction of Aveva’s new 10,000sq.ft London Headquarters at Level 5, 30 Cannon St.

£1.2
  • Fitout,
  • Commercial,
  • NZ

Mastercard Auckland

Built was engaged by Mastercard to complete fitout works to their existing office in Auckland.

$1m